RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3210035210 - Archived data from Thu, 15. April 2021 17:01:03 CEST


This is all the information about APD 3210035210. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3210035210
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 23.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 31
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3637153 V     T = -25 °C: 344.2763113 V
Voltage for Gain 150: T = +20 °C: 387.2427111 V     T = -25 °C: 351.6198655 V
Voltage for Gain 200: T = +20 °C: 391.6381633 V     T = -25 °C: 355.7435715 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.488026141 V-1     T = -25 °C: 4.875158645 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.787347569 V-1     T = -25 °C: 9.933215654 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.25984891 V-1     T = -25 °C: 15.89831875 V-1
Break-through voltage: T = +20 °C: 406.8567466 V     T = -25 °C: 370.6762325 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:15 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:03 CEST jreher Updated box and position via API.
05. Feb 2021 11:06:17 CET jreher Updated box and position via API.
11. Aug 2020 17:54:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:15 CEST jreher Updated APD location via API.
12. Dec 2019 14:43:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:34 CET jreher Updated APD location via API.
27. Nov 2019 19:53:23 CET jreher Updated APD location via API.
25. Nov 2019 17:21:56 CET jreher Updated box and position via API.
20. Sep 2019 18:47:05 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:50 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:01 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:22 CEST Tobias Imported from Hamamatsu datasheet.