RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3210035194 - Archived data from Tue, 11. August 2020 17:54:37 CEST


This is all the information about APD 3210035194. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3210035194
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.1 V
Dark current: 21.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 18
EP1 batch: 160
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5543193 V     T = -25 °C: 344.1536565 V
Voltage for Gain 150: T = +20 °C: 387.4566924 V     T = -25 °C: 351.5729027 V
Voltage for Gain 200: T = +20 °C: 391.8517061 V     T = -25 °C: 355.7345774 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.351663043 V-1     T = -25 °C: 4.841378204 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.466965017 V-1     T = -25 °C: 9.827796218 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5750426 V-1     T = -25 °C: 15.64998667 V-1
Break-through voltage: T = +20 °C: 407.1971809 V     T = -25 °C: 370.8849861 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:15 CET jreher Updated box and position via API.
11. Aug 2020 17:54:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:14 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:14 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:04:35 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:33 CET jreher Updated APD location via API.
27. Nov 2019 19:53:22 CET jreher Updated APD location via API.
25. Nov 2019 17:21:55 CET jreher Updated box and position via API.
20. Sep 2019 18:47:04 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.