RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3210035191 - Archived data from Tue, 11. August 2020 17:54:36 CEST


This is all the information about APD 3210035191. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3210035191
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 16.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 16
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.991461 V     T = -25 °C: 341.2791481 V
Voltage for Gain 150: T = +20 °C: 383.8332983 V     T = -25 °C: 348.5115299 V
Voltage for Gain 200: T = +20 °C: 388.2241702 V     T = -25 °C: 352.5773055 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.628795193 V-1     T = -25 °C: 4.916364463 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.08225723 V-1     T = -25 °C: 9.157879767 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01758053 V-1     T = -25 °C: 16.35477086 V-1
Break-through voltage: T = +20 °C: 404.2058385 V     T = -25 °C: 367.8843232 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:15 CET jreher Updated box and position via API.
11. Aug 2020 17:54:36 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:14 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:14 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:04:35 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:33 CET jreher Updated APD location via API.
27. Nov 2019 19:53:22 CET jreher Updated APD location via API.
25. Nov 2019 17:21:54 CET jreher Updated box and position via API.
20. Sep 2019 18:46:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:49 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.