RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3210035181 - Archived data from Tue, 11. August 2020 17:54:35 CEST


This is all the information about APD 3210035181. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3210035181
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 19.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 8
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7894035 V     T = -25 °C: 347.2815704 V
Voltage for Gain 150: T = +20 °C: 389.6460227 V     T = -25 °C: 354.6141071 V
Voltage for Gain 200: T = +20 °C: 393.9950423 V     T = -25 °C: 358.5341271 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.679524778 V-1     T = -25 °C: 6.442649637 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.30000455 V-1     T = -25 °C: 12.24797017 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55131677 V-1     T = -25 °C: 13.11911863 V-1
Break-through voltage: T = +20 °C: 408.9228828 V     T = -25 °C: 372.5970802 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:14 CET jreher Updated box and position via API.
11. Aug 2020 17:54:35 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:13 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:14 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:04:35 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:32 CET jreher Updated APD location via API.
27. Nov 2019 19:53:21 CET jreher Updated APD location via API.
25. Nov 2019 17:21:54 CET jreher Updated box and position via API.
20. Sep 2019 18:46:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.