RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035165 - Archived data from Tue, 11. August 2020 17:54:34 CEST


This is all the information about APD 3209035165. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035165
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 30.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 139
Position in Box: 3
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8730093 V     T = -25 °C: 351.038812 V
Voltage for Gain 150: T = +20 °C: 394.687006 V     T = -25 °C: 358.4937758 V
Voltage for Gain 200: T = +20 °C: 398.9934619 V     T = -25 °C: 362.6619691 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.673897943 V-1     T = -25 °C: 4.869429451 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.42710168 V-1     T = -25 °C: 8.973176122 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.76138918 V-1     T = -25 °C: 15.92184878 V-1
Break-through voltage: T = +20 °C: 412.8081867 V     T = -25 °C: 376.5099014 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:13 CET jreher Updated box and position via API.
11. Aug 2020 17:54:34 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:13 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:13 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:04:34 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:32 CET jreher Updated APD location via API.
27. Nov 2019 19:53:21 CET jreher Updated APD location via API.
25. Nov 2019 17:21:53 CET jreher Updated box and position via API.
20. Sep 2019 18:46:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:48 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.