RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035146 - Archived data from Tue, 11. August 2020 17:54:33 CEST


This is all the information about APD 3209035146. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035146
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.7 V
Dark current: 26 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 48
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8021149 V     T = -25 °C: 350.1546165 V
Voltage for Gain 150: T = +20 °C: 393.6594486 V     T = -25 °C: 357.5724238 V
Voltage for Gain 200: T = +20 °C: 398.021359 V     T = -25 °C: 361.722749 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.637682517 V-1     T = -25 °C: 4.831242812 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.163224085 V-1     T = -25 °C: 9.754741783 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21960559 V-1     T = -25 °C: 15.41474973 V-1
Break-through voltage: T = +20 °C: 413.2170685 V     T = -25 °C: 376.7875496 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:11 CET jreher Updated box and position via API.
11. Aug 2020 17:54:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:12 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:07 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:31 CET jreher Updated APD location via API.
27. Nov 2019 19:53:13 CET jreher Updated APD location via API.
25. Nov 2019 17:21:52 CET jreher Updated box and position via API.
20. Sep 2019 18:46:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:00 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.