RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035136 - Archived data from Tue, 11. August 2020 17:54:31 CEST


This is all the information about APD 3209035136. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035136
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.2 V
Dark current: 17.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 39
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0730122 V     T = -25 °C: 347.4985455 V
Voltage for Gain 150: T = +20 °C: 390.9316101 V     T = -25 °C: 354.8257865 V
Voltage for Gain 200: T = +20 °C: 395.3081614 V     T = -25 °C: 358.9360425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584154026 V-1     T = -25 °C: 4.780648013 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.994688708 V-1     T = -25 °C: 9.731518644 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.970873 V-1     T = -25 °C: 15.42177906 V-1
Break-through voltage: T = +20 °C: 411.0730191 V     T = -25 °C: 374.3376944 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:09 CET jreher Updated box and position via API.
11. Aug 2020 17:54:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:11 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:31 CET jreher Updated APD location via API.
27. Nov 2019 19:53:13 CET jreher Updated APD location via API.
25. Nov 2019 17:21:52 CET jreher Updated box and position via API.
20. Sep 2019 18:46:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:59 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.