RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3209035132 - Archived data from Tue, 11. August 2020 17:54:31 CEST


This is all the information about APD 3209035132. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3209035132
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 387.4 V
Dark current: 19.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 36
EP1 batch: 159
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.720324 V     T = -25 °C: 350.0685835 V
Voltage for Gain 150: T = +20 °C: 393.5200673 V     T = -25 °C: 357.4721263 V
Voltage for Gain 200: T = +20 °C: 397.8283624 V     T = -25 °C: 361.6122344 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.391174152 V-1     T = -25 °C: 4.889399348 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.606782046 V-1     T = -25 °C: 9.033027356 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.09621918 V-1     T = -25 °C: 16.10043253 V-1
Break-through voltage: T = +20 °C: 412.0802191 V     T = -25 °C: 375.8063506 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:53 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:25 CET jreher Updated box and position via API.
05. Feb 2021 11:06:09 CET jreher Updated box and position via API.
11. Aug 2020 17:54:31 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:11 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:31 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:06 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:30 CET jreher Updated APD location via API.
27. Nov 2019 19:53:12 CET jreher Updated APD location via API.
25. Nov 2019 17:21:51 CET jreher Updated box and position via API.
20. Sep 2019 18:46:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:59 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.