RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3208035095 - Archived data from Tue, 11. August 2020 17:54:27 CEST


This is all the information about APD 3208035095. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3208035095
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 17
EP1 batch: 158
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3269007 V     T = -25 °C: 343.4527779 V
Voltage for Gain 150: T = +20 °C: 386.1799535 V     T = -25 °C: 350.7391595 V
Voltage for Gain 200: T = +20 °C: 390.5691581 V     T = -25 °C: 354.8232129 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.513126775 V-1     T = -25 °C: 4.860645834 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.844854216 V-1     T = -25 °C: 9.976562888 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40128931 V-1     T = -25 °C: 15.931552 V-1
Break-through voltage: T = +20 °C: 406.2702773 V     T = -25 °C: 370.0389592 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:06:07 CET jreher Updated box and position via API.
11. Aug 2020 17:54:27 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:09 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:49 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:54 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:29 CET jreher Updated APD location via API.
27. Nov 2019 19:53:11 CET jreher Updated APD location via API.
25. Nov 2019 17:21:50 CET jreher Updated box and position via API.
20. Sep 2019 18:46:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:59 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:21 CEST Tobias Imported from Hamamatsu datasheet.