RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3208035090 - Archived data from Fri, 05. February 2021 11:06:06 CET


This is all the information about APD 3208035090. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3208035090
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.4 V
Dark current: 19.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 138
Position in Box: 12
EP1 batch: 158
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.1907762 V     T = -25 °C: 341.8232785 V
Voltage for Gain 150: T = +20 °C: 384.0165116 V     T = -25 °C: 348.9823882 V
Voltage for Gain 200: T = +20 °C: 388.4048877 V     T = -25 °C: 353.0079968 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.56041332 V-1     T = -25 °C: 5.125200635 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.864897148 V-1     T = -25 °C: 9.694474472 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34893523 V-1     T = -25 °C: 15.49872893 V-1
Break-through voltage: T = +20 °C: 404.3923969 V     T = -25 °C: 368.1671377 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:17:26 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:57 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:06 CET jreher Updated box and position via API.
11. Aug 2020 17:54:26 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:09 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:49 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:53 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:28 CET jreher Updated APD location via API.
27. Nov 2019 19:53:11 CET jreher Updated APD location via API.
25. Nov 2019 17:21:49 CET jreher Updated box and position via API.
20. Sep 2019 18:46:05 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:58 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.