RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3208035072 - Archived data from Fri, 05. February 2021 11:06:02 CET


This is all the information about APD 3208035072. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3208035072
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 47
EP1 batch: 157
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5327304 V     T = -25 °C: 345.3565546 V
Voltage for Gain 150: T = +20 °C: 388.4117937 V     T = -25 °C: 352.6720497 V
Voltage for Gain 200: T = +20 °C: 392.7865496 V     T = -25 °C: 356.7776389 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.43918544 V-1     T = -25 °C: 4.843821624 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.561700056 V-1     T = -25 °C: 9.888640607 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.86929947 V-1     T = -25 °C: 15.77799249 V-1
Break-through voltage: T = +20 °C: 407.551835 V     T = -25 °C: 371.252025 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:14:09 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:28:54 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:02 CET jreher Updated box and position via API.
11. Aug 2020 17:54:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:07 CEST jreher Updated APD location via API.
09. Dec 2019 18:13:48 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:05:52 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:27 CET jreher Updated APD location via API.
27. Nov 2019 19:53:02 CET jreher Updated APD location via API.
25. Nov 2019 17:21:48 CET jreher Updated box and position via API.
20. Sep 2019 18:45:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:58 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.