RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3208035052 - Archived data from Fri, 05. February 2021 11:06:00 CET


This is all the information about APD 3208035052. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3208035052
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 17.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 33
EP1 batch: 157
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9820129 V     T = -25 °C: 343.0287867 V
Voltage for Gain 150: T = +20 °C: 385.8196719 V     T = -25 °C: 350.2809546 V
Voltage for Gain 200: T = +20 °C: 390.1926639 V     T = -25 °C: 354.3648358 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.666484257 V-1     T = -25 °C: 5.022301066 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.144004865 V-1     T = -25 °C: 9.389595794 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1617751 V-1     T = -25 °C: 14.79864066 V-1
Break-through voltage: T = +20 °C: 405.6417236 V     T = -25 °C: 369.3325678 V
   
Notes:


Version history

Time Author Change comment
16. May 2022 13:33:12 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:06:00 CET jreher Updated box and position via API.
11. Aug 2020 17:54:19 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:06 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:06 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:51 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:26 CET jreher Updated APD location via API.
27. Nov 2019 19:53:01 CET jreher Updated APD location via API.
25. Nov 2019 17:21:46 CET jreher Updated box and position via API.
20. Sep 2019 18:45:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:34 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:57 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.