RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3207035019 - Archived data from Tue, 11. August 2020 17:54:15 CEST


This is all the information about APD 3207035019. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3207035019
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 383.5 V
Dark current: 19.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 137
Position in Box: 13
EP1 batch: 156
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7886006 V     T = -25 °C: 348.351419 V
Voltage for Gain 150: T = +20 °C: 391.613824 V     T = -25 °C: 355.7567053 V
Voltage for Gain 200: T = +20 °C: 395.9441635 V     T = -25 °C: 359.9108446 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660416483 V-1     T = -25 °C: 4.77469742 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.370091542 V-1     T = -25 °C: 9.654414888 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.63920782 V-1     T = -25 °C: 15.28083681 V-1
Break-through voltage: T = +20 °C: 408.8174226 V     T = -25 °C: 373.9565446 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:52 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 11:14:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:58 CET jreher Updated box and position via API.
11. Aug 2020 17:54:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:04 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:05 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:50 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:06:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:25 CET jreher Updated APD location via API.
27. Nov 2019 19:53:00 CET jreher Updated APD location via API.
25. Nov 2019 17:21:45 CET jreher Updated box and position via API.
20. Sep 2019 18:45:07 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:57 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:20 CEST Tobias Imported from Hamamatsu datasheet.