RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3205034928 - Archived data from Tue, 11. August 2020 18:08:22 CEST


This is all the information about APD 3205034928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3205034928
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.4 V
Dark current: 26.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 135
Position in Box: 50
EP1 batch: 154
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.8885512 V     T = -25 °C: 343.5129587 V
Voltage for Gain 150: T = +20 °C: 410.8987129 V     T = -25 °C: 348.86464 V
Voltage for Gain 200: T = +20 °C: 410.9088746 V     T = -25 °C: 356.3304753 V
Gain/Voltage slope at M = 100: T = +20 °C: 4920.433449 V-1     T = -25 °C: 44.37238646 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 4920.433449 V-1     T = -25 °C: 36.60029438 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 4920.433449 V-1     T = -25 °C: 16.72011444 V-1
Break-through voltage: T = +20 °C: 411.7233566 V     T = -25 °C: 375.1581112 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:46 CET jreher Updated box and position via API.
11. Aug 2020 18:08:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:58 CEST jreher Updated APD location via API.
09. Mar 2020 17:39:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:20 CET jreher Updated APD location via API.
27. Nov 2019 19:52:40 CET jreher Updated APD location via API.
25. Nov 2019 17:21:38 CET jreher Updated box and position via API.
20. Sep 2019 18:43:39 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:54 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:18 CEST Tobias Imported from Hamamatsu datasheet.