RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3204034864 - Archived data from Tue, 11. August 2020 18:08:14 CEST


This is all the information about APD 3204034864. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3204034864
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 390 V
Dark current: 29.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 135
Position in Box: 10
EP1 batch: 153
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 390.1454684 V     T = -25 °C: 354.115155 V
Voltage for Gain 150: T = +20 °C: 397.9286394 V     T = -25 °C: 361.6524536 V
Voltage for Gain 200: T = +20 °C: 402.2774701 V     T = -25 °C: 365.8831259 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.744212698 V-1     T = -25 °C: 4.718356057 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251192384 V-1     T = -25 °C: 9.600257957 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62776167 V-1     T = -25 °C: 15.20854896 V-1
Break-through voltage: T = +20 °C: 415.465958 V     T = -25 °C: 380.4463555 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:42 CET jreher Updated box and position via API.
11. Aug 2020 18:08:14 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:55 CEST jreher Updated APD location via API.
09. Mar 2020 17:39:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:17 CET jreher Updated APD location via API.
27. Nov 2019 19:52:37 CET jreher Updated APD location via API.
25. Nov 2019 17:21:35 CET jreher Updated box and position via API.
20. Sep 2019 18:42:41 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:53 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:18 CEST Tobias Imported from Hamamatsu datasheet.