RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3204034831 - Archived data from Tue, 11. August 2020 18:08:08 CEST


This is all the information about APD 3204034831. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3204034831
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 25.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 32
EP1 batch: 152
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7224853 V     T = -25 °C: 348.1566142 V
Voltage for Gain 150: T = +20 °C: 391.5316438 V     T = -25 °C: 355.5056134 V
Voltage for Gain 200: T = +20 °C: 395.8546995 V     T = -25 °C: 359.6205083 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.732863021 V-1     T = -25 °C: 4.90204478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.581362805 V-1     T = -25 °C: 9.105660922 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95502496 V-1     T = -25 °C: 16.21498716 V-1
Break-through voltage: T = +20 °C: 410.7309886 V     T = -25 °C: 374.1690262 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:36 CET jreher Updated box and position via API.
11. Aug 2020 18:08:08 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:52 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:37 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:15 CET jreher Updated APD location via API.
27. Nov 2019 19:52:28 CET jreher Updated APD location via API.
25. Nov 2019 17:21:32 CET jreher Updated box and position via API.
17. Sep 2019 12:07:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:52 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:17 CEST Tobias Imported from Hamamatsu datasheet.