RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3203034803 - Archived data from Tue, 11. August 2020 18:08:04 CEST


This is all the information about APD 3203034803. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3203034803
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 30.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 8
EP1 batch: 151
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 398.9817223 V     T = -25 °C: 327.1039286 V
Voltage for Gain 150: T = +20 °C: 402.7736762 V     T = -25 °C: 327.7176632 V
Voltage for Gain 200: T = +20 °C: 402.7730721 V     T = -25 °C: 350.18697 V
Gain/Voltage slope at M = 100: T = +20 °C: 13.5672472 V-1     T = -25 °C: 81.46844282 V-1
Gain/Voltage slope at M = 150: T = +20 °C: -31085.19234 V-1     T = -25 °C: 81.46844282 V-1
Gain/Voltage slope at M = 200: T = +20 °C: -31085.19234 V-1     T = -25 °C: 82.68907375 V-1
Break-through voltage: T = +20 °C: 401.5070292 V     T = -25 °C: 369.2603194 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:33 CET jreher Updated box and position via API.
11. Aug 2020 18:08:04 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:50 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:13 CET jreher Updated APD location via API.
27. Nov 2019 19:52:26 CET jreher Updated APD location via API.
25. Nov 2019 17:21:30 CET jreher Updated box and position via API.
17. Sep 2019 12:06:15 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:08 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:51 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.