RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3202034790 - Archived data from Tue, 11. August 2020 18:08:02 CEST


This is all the information about APD 3202034790. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3202034790
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 375.7 V
Dark current: 20.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 134
Position in Box: 1
EP1 batch: 151
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.2841665 V     T = -25 °C: 324.4445993 V
Voltage for Gain 150: T = +20 °C: 396.9866267 V     T = -25 °C: 329.5728197 V
Voltage for Gain 200: T = +20 °C: 398.5502637 V     T = -25 °C: 329.7405409 V
Gain/Voltage slope at M = 100: T = +20 °C: 13.64910212 V-1     T = -25 °C: 89.03544571 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 23.82991474 V-1     T = -25 °C: 298.1137758 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 52.03364774 V-1     T = -25 °C: 298.1137758 V-1
Break-through voltage: T = +20 °C: 399.7333745 V     T = -25 °C: 367.6735921 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:33 CET jreher Updated box and position via API.
11. Aug 2020 18:08:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:49 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:13 CET jreher Updated APD location via API.
27. Nov 2019 19:52:25 CET jreher Updated APD location via API.
25. Nov 2019 17:21:30 CET jreher Updated box and position via API.
17. Sep 2019 12:06:15 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:54:07 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:51 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.