RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3202034786 - Archived data from Tue, 11. August 2020 17:54:12 CEST


This is all the information about APD 3202034786. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3202034786
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.9 V
Dark current: 24.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 47
EP1 batch: 150
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.6632505 V     T = -25 °C: 339.3315015 V
Voltage for Gain 150: T = +20 °C: 381.4483069 V     T = -25 °C: 346.472752 V
Voltage for Gain 200: T = +20 °C: 385.7968914 V     T = -25 °C: 350.4825207 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.781323259 V-1     T = -25 °C: 4.96708064 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.534635976 V-1     T = -25 °C: 9.215690035 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71271487 V-1     T = -25 °C: 16.660763 V-1
Break-through voltage: T = +20 °C: 401.4348567 V     T = -25 °C: 365.3955537 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:26 CET jreher Updated box and position via API.
11. Aug 2020 17:54:12 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:47 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:21 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:08:25 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:11 CET jreher Updated APD location via API.
27. Nov 2019 19:52:09 CET jreher Updated APD location via API.
25. Nov 2019 17:21:26 CET jreher Updated box and position via API.
17. Sep 2019 12:04:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:51 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.