Subdetector specification:  
Serial: 3202034779
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.9 V
Dark current: 26 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 40
EP1 batch: 150
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.8834668 V     T = -25 °C: 342.1057553 V
Voltage for Gain 150: T = +20 °C: 383.7302361 V     T = -25 °C: 349.2904383 V
Voltage for Gain 200: T = +20 °C: 388.1207553 V     T = -25 °C: 353.4750715 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.617613556 V-1     T = -25 °C: 4.817851501 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.115051459 V-1     T = -25 °C: 9.460810623 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.15828378 V-1     T = -25 °C: 16.51152323 V-1
Break-through voltage: T = +20 °C: 403.4928345 V     T = -25 °C: 368.5302232 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:25 CET jreher Updated box and position via API.
11. Aug 2020 17:54:10 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:46 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:21 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:08:25 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:10 CET jreher Updated APD location via API.
27. Nov 2019 19:52:08 CET jreher Updated APD location via API.
25. Nov 2019 17:21:26 CET jreher Updated box and position via API.
17. Sep 2019 12:04:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:51 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.