Show Hamamatsu Avalanche Photo Diode 3201034766 - Archived data from Tue, 11. August 2020 17:54:09 CEST


This is all the information about APD 3201034766. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3201034766
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 26.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 32
EP1 batch: 150
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7041501 V     T = -25 °C: 347.5820093 V
Voltage for Gain 150: T = +20 °C: 389.5806755 V     T = -25 °C: 355.0322418 V
Voltage for Gain 200: T = +20 °C: 393.9459578 V     T = -25 °C: 359.096444 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.367129383 V-1     T = -25 °C: 5.305178528 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.450190482 V-1     T = -25 °C: 8.920041387 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.69924382 V-1     T = -25 °C: 19.25254973 V-1
Break-through voltage: T = +20 °C: 408.2317122 V     T = -25 °C: 373.4581573 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:04:43 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:10 CET jreher Updated box and position via API.
05. Feb 2021 11:05:24 CET jreher Updated box and position via API.
11. Aug 2020 17:54:09 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:46 CEST jreher Updated APD location via API.
09. Dec 2019 18:14:20 CET spankonin Updated APD batch assignment via API.
09. Dec 2019 18:08:24 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:10 CET jreher Updated APD location via API.
27. Nov 2019 19:52:08 CET jreher Updated APD location via API.
25. Nov 2019 17:21:25 CET jreher Updated box and position via API.
17. Sep 2019 12:04:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:50 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.