RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3201034758 - Archived data from Wed, 01. December 2021 12:57:22 CET


This is all the information about APD 3201034758. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3201034758
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 376.1 V
Dark current: 22.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 25
EP1 batch: 149
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.170808 V     T = -25 °C: 340.7911839 V
Voltage for Gain 150: T = +20 °C: 382.9455504 V     T = -25 °C: 347.994629 V
Voltage for Gain 200: T = +20 °C: 387.2975232 V     T = -25 °C: 352.0465209 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588431338 V-1     T = -25 °C: 5.105549575 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.978866573 V-1     T = -25 °C: 9.63328553 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.76679102 V-1     T = -25 °C: 15.32693393 V-1
Break-through voltage: T = +20 °C: 401.7220353 V     T = -25 °C: 366.0904256 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:13:05 CET oafedulidis Assigned to capsule by script
01. Dec 2021 12:57:22 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:05:23 CET jreher Updated box and position via API.
11. Aug 2020 17:54:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:45 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:31 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:09 CET jreher Updated APD location via API.
27. Nov 2019 19:52:07 CET jreher Updated APD location via API.
25. Nov 2019 17:21:25 CET jreher Updated box and position via API.
17. Sep 2019 12:08:20 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:58 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:50 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:16 CEST Tobias Imported from Hamamatsu datasheet.