Show Hamamatsu Avalanche Photo Diode 3201034758 - Archived data from Mon, 09. December 2019 18:15:31 CET
This is all the information about APD 3201034758. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 3201034758 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Giessen |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | G07 |
Break-through voltage: | 402 V |
Voltage for Gain 100 (T=+25°C): | 376.1 V |
Dark current: | 22.7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 132 |
Position in Box: | 25 |
EP1 batch: | 149 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
15. Nov 2022 13:13:05 CET | oafedulidis | Assigned to capsule by script |
01. Dec 2021 12:57:22 CET | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:05:23 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:54:07 CEST | jreher | Updated APD characteristics via API. |
11. Aug 2020 17:50:45 CEST | jreher | Updated APD location via API. |
09. Dec 2019 18:15:31 CET | spankonin | Updated APD batch assignment via API. |
29. Nov 2019 11:48:09 CET | jreher | Updated APD location via API. |
27. Nov 2019 19:52:07 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:21:25 CET | jreher | Updated box and position via API. |
17. Sep 2019 12:08:20 CEST | jgrochowski | Updated APD batch assignment via API. |
05. Jul 2019 13:53:58 CEST | jreher | Updated APD location via API. |
03. Jan 2019 00:14:50 CET | Tobias | Corrected dark current unit. |
14. Aug 2018 16:04:16 CEST | Tobias | Imported from Hamamatsu datasheet. |