RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3116034741 - Archived data from Tue, 11. August 2020 17:54:07 CEST


This is all the information about APD 3116034741. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3116034741
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 12.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 132
Position in Box: 20
EP1 batch: 149
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.3611108 V     T = -25 °C: 341.8828654 V
Voltage for Gain 150: T = +20 °C: 384.1633329 V     T = -25 °C: 349.0855567 V
Voltage for Gain 200: T = +20 °C: 388.5334352 V     T = -25 °C: 353.1415559 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.535037438 V-1     T = -25 °C: 5.106985403 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.808300974 V-1     T = -25 °C: 9.603808017 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.44956632 V-1     T = -25 °C: 15.30487594 V-1
Break-through voltage: T = +20 °C: 404.1417617 V     T = -25 °C: 368.1520331 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:23 CET jreher Updated box and position via API.
11. Aug 2020 17:54:07 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:44 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:30 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:09 CET jreher Updated APD location via API.
27. Nov 2019 19:52:07 CET jreher Updated APD location via API.
25. Nov 2019 17:21:24 CET jreher Updated box and position via API.
17. Sep 2019 12:08:20 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:57 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:50 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:15 CEST Tobias Imported from Hamamatsu datasheet.