RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3115034699 - Archived data from Tue, 11. August 2020 17:54:00 CEST


This is all the information about APD 3115034699. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3115034699
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 16.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 131
Position in Box: 36
EP1 batch: 148
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3023665 V     T = -25 °C: 343.3637054 V
Voltage for Gain 150: T = +20 °C: 386.1428353 V     T = -25 °C: 350.6801558 V
Voltage for Gain 200: T = +20 °C: 390.5305803 V     T = -25 °C: 354.7966315 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.507056414 V-1     T = -25 °C: 4.839577201 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.78518122 V-1     T = -25 °C: 9.852896793 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32753845 V-1     T = -25 °C: 15.62242252 V-1
Break-through voltage: T = +20 °C: 404.9383543 V     T = -25 °C: 369.2588118 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:17 CET jreher Updated box and position via API.
11. Aug 2020 17:54:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:41 CEST jreher Updated APD location via API.
09. Dec 2019 18:15:57 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:06 CET jreher Updated APD location via API.
27. Nov 2019 19:51:57 CET jreher Updated APD location via API.
25. Nov 2019 17:21:21 CET jreher Updated box and position via API.
17. Sep 2019 11:36:04 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:53:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:49 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:15 CEST Tobias Imported from Hamamatsu datasheet.