RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3113034638 - Archived data from Tue, 11. August 2020 18:01:00 CEST


This is all the information about APD 3113034638. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3113034638
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 373.7 V
Dark current: 21.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 41
EP1 batch: 146
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.3903796 V     T = -25 °C: 338.9949921 V
Voltage for Gain 150: T = +20 °C: 381.1882733 V     T = -25 °C: 346.170726 V
Voltage for Gain 200: T = +20 °C: 385.5582274 V     T = -25 °C: 350.2109615 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.523140129 V-1     T = -25 °C: 5.080267879 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.834369879 V-1     T = -25 °C: 9.583376052 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37056047 V-1     T = -25 °C: 15.27493457 V-1
Break-through voltage: T = +20 °C: 401.6298335 V     T = -25 °C: 365.589464 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:10 CET jreher Updated box and position via API.
11. Aug 2020 18:01:00 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:37 CEST jreher Updated APD location via API.
28. Jan 2020 16:17:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:03 CET jreher Updated APD location via API.
27. Nov 2019 19:51:46 CET jreher Updated APD location via API.
25. Nov 2019 17:21:16 CET jreher Updated box and position via API.
03. Sep 2019 11:34:47 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:43 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:47 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:14 CEST Tobias Imported from Hamamatsu datasheet.