RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3113034622 - Archived data from Fri, 05. February 2021 11:05:09 CET


This is all the information about APD 3113034622. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3113034622
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 18.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 26
EP1 batch: 146
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7503851 V     T = -25 °C: 343.0766228 V
Voltage for Gain 150: T = +20 °C: 384.6067912 V     T = -25 °C: 350.1799445 V
Voltage for Gain 200: T = +20 °C: 388.9718838 V     T = -25 °C: 353.8641859 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.703305628 V-1     T = -25 °C: 6.076340496 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.334483562 V-1     T = -25 °C: 12.56090187 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48461318 V-1     T = -25 °C: 12.3998847 V-1
Break-through voltage: T = +20 °C: 404.7827545 V     T = -25 °C: 367.9707653 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:18:56 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:19 CET jreher Updated box and position via API.
05. Feb 2021 11:05:09 CET jreher Updated box and position via API.
11. Aug 2020 18:00:57 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:36 CEST jreher Updated APD location via API.
28. Jan 2020 16:17:07 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:02 CET jreher Updated APD location via API.
27. Nov 2019 19:51:45 CET jreher Updated APD location via API.
25. Nov 2019 17:21:15 CET jreher Updated box and position via API.
03. Sep 2019 11:34:46 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:42 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:47 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:14 CEST Tobias Imported from Hamamatsu datasheet.