RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3112034598 - Archived data from Fri, 05. February 2021 11:05:07 CET


This is all the information about APD 3112034598. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3112034598
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 14.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 14
EP1 batch: 145
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9082999 V     T = -25 °C: 344.0345389 V
Voltage for Gain 150: T = +20 °C: 386.7509695 V     T = -25 °C: 351.3395315 V
Voltage for Gain 200: T = +20 °C: 391.1194158 V     T = -25 °C: 355.458118 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.636508516 V-1     T = -25 °C: 4.966582419 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.14299469 V-1     T = -25 °C: 9.175932362 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16346364 V-1     T = -25 °C: 16.31970481 V-1
Break-through voltage: T = +20 °C: 405.9148909 V     T = -25 °C: 370.2012313 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:20:51 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:43 CET jreher Updated box and position via API.
05. Feb 2021 11:05:07 CET jreher Updated box and position via API.
11. Aug 2020 18:00:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:35 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:01 CET jreher Updated APD location via API.
27. Nov 2019 19:51:44 CET jreher Updated APD location via API.
25. Nov 2019 17:21:14 CET jreher Updated box and position via API.
03. Sep 2019 11:34:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:46 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:13 CEST Tobias Imported from Hamamatsu datasheet.