RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3112034591 - Archived data from Tue, 11. August 2020 18:00:53 CEST


This is all the information about APD 3112034591. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3112034591
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 18.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 130
Position in Box: 8
EP1 batch: 145
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9888059 V     T = -25 °C: 344.9858855 V
Voltage for Gain 150: T = +20 °C: 387.8857858 V     T = -25 °C: 352.343164 V
Voltage for Gain 200: T = +20 °C: 392.291985 V     T = -25 °C: 356.5144422 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.611055 V-1     T = -25 °C: 5.003819514 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.052767031 V-1     T = -25 °C: 9.159249457 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99372422 V-1     T = -25 °C: 16.33853734 V-1
Break-through voltage: T = +20 °C: 405.615266 V     T = -25 °C: 370.8397722 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:23:21 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:47 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:05:07 CET jreher Updated box and position via API.
11. Aug 2020 18:00:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:34 CEST jreher Updated APD location via API.
28. Jan 2020 16:15:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:00 CET jreher Updated APD location via API.
27. Nov 2019 19:51:44 CET jreher Updated APD location via API.
25. Nov 2019 17:21:14 CET jreher Updated box and position via API.
03. Sep 2019 11:34:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:41 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:46 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:13 CEST Tobias Imported from Hamamatsu datasheet.