RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3112034580 - Archived data from Tue, 11. August 2020 18:08:02 CEST


This is all the information about APD 3112034580. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3112034580
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.7 V
Dark current: 21.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 129
Position in Box: 48
EP1 batch: 145
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.1999196 V     T = -25 °C: 325.5785851 V
Voltage for Gain 150: T = +20 °C: 397.9172595 V     T = -25 °C: 331.7463531 V
Voltage for Gain 200: T = +20 °C: 399.3590713 V     T = -25 °C: 335.8525408 V
Gain/Voltage slope at M = 100: T = +20 °C: 13.05410466 V-1     T = -25 °C: 85.17102408 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 26.32917995 V-1     T = -25 °C: 38.29278116 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 43.42125066 V-1     T = -25 °C: 264.2379297 V-1
Break-through voltage: T = +20 °C: 399.0188858 V     T = -25 °C: 367.0146268 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:05:03 CET jreher Updated box and position via API.
11. Aug 2020 18:08:02 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:33 CEST jreher Updated APD location via API.
09. Mar 2020 17:38:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:00 CET jreher Updated APD location via API.
27. Nov 2019 19:51:36 CET jreher Updated APD location via API.
25. Nov 2019 17:21:12 CET jreher Updated box and position via API.
03. Sep 2019 11:34:26 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:35 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:46 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:13 CEST Tobias Imported from Hamamatsu datasheet.