RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3110034515 - Archived data from Thu, 15. April 2021 17:00:43 CEST


This is all the information about APD 3110034515. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3110034515
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 26.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 129
Position in Box: 5
EP1 batch: 143
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1292683 V     T = -25 °C: 346.9556011 V
Voltage for Gain 150: T = +20 °C: 390.078593 V     T = -25 °C: 354.3550808 V
Voltage for Gain 200: T = +20 °C: 394.480796 V     T = -25 °C: 358.5070243 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.695536221 V-1     T = -25 °C: 4.934809842 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.216257472 V-1     T = -25 °C: 9.096356711 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.62592571 V-1     T = -25 °C: 16.20320667 V-1
Break-through voltage: T = +20 °C: 407.4812143 V     T = -25 °C: 373.5336091 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:38 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:43 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:59 CET jreher Updated box and position via API.
11. Aug 2020 18:07:54 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:29 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:17 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:57 CET jreher Updated APD location via API.
27. Nov 2019 19:51:32 CET jreher Updated APD location via API.
25. Nov 2019 17:21:09 CET jreher Updated box and position via API.
03. Sep 2019 11:33:38 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:32 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:44 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:12 CEST Tobias Imported from Hamamatsu datasheet.