RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3110034487 - Archived data from Fri, 05. February 2021 11:04:54 CET


This is all the information about APD 3110034487. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3110034487
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 19.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 34
EP1 batch: 143
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6079287 V     T = -25 °C: 343.7632447 V
Voltage for Gain 150: T = +20 °C: 386.4534045 V     T = -25 °C: 351.0039099 V
Voltage for Gain 200: T = +20 °C: 390.8194502 V     T = -25 °C: 355.0833974 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.4258467 V-1     T = -25 °C: 5.114312948 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.58828329 V-1     T = -25 °C: 9.646018744 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84547295 V-1     T = -25 °C: 15.36069239 V-1
Break-through voltage: T = +20 °C: 406.2382513 V     T = -25 °C: 370.0469216 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:01:48 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:19 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:54 CET jreher Updated box and position via API.
11. Aug 2020 17:53:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:27 CEST jreher Updated APD location via API.
09. Dec 2019 18:16:48 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:55 CET jreher Updated APD location via API.
27. Nov 2019 19:51:24 CET jreher Updated APD location via API.
25. Nov 2019 17:21:06 CET jreher Updated box and position via API.
03. Sep 2019 11:33:36 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:44 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:11 CEST Tobias Imported from Hamamatsu datasheet.