RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3110034475 - Archived data from Tue, 11. August 2020 17:53:48 CEST


This is all the information about APD 3110034475. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3110034475
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 375.9 V
Dark current: 16.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 26
EP1 batch: 143
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.244935 V     T = -25 °C: 341.449157 V
Voltage for Gain 150: T = +20 °C: 384.0167954 V     T = -25 °C: 348.6820399 V
Voltage for Gain 200: T = +20 °C: 388.3823954 V     T = -25 °C: 352.7330975 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.58474663 V-1     T = -25 °C: 4.873899973 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.978358267 V-1     T = -25 °C: 10.01693133 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.90059865 V-1     T = -25 °C: 16.14884108 V-1
Break-through voltage: T = +20 °C: 404.152921 V     T = -25 °C: 367.9770631 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:09:38 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:28 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:53 CET jreher Updated box and position via API.
11. Aug 2020 17:53:48 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:27 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:20 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:54 CET jreher Updated APD location via API.
27. Nov 2019 19:51:23 CET jreher Updated APD location via API.
25. Nov 2019 17:21:06 CET jreher Updated box and position via API.
03. Sep 2019 11:33:35 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:26 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:43 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:11 CEST Tobias Imported from Hamamatsu datasheet.