RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3109034453 - Archived data from Tue, 11. August 2020 17:53:45 CEST


This is all the information about APD 3109034453. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3109034453
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.1 V
Dark current: 15.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 10
EP1 batch: 142
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.3874411 V     T = -25 °C: 339.9220408 V
Voltage for Gain 150: T = +20 °C: 382.165096 V     T = -25 °C: 347.0774921 V
Voltage for Gain 200: T = +20 °C: 386.5274173 V     T = -25 °C: 351.103321 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.545505113 V-1     T = -25 °C: 5.110644019 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.851975514 V-1     T = -25 °C: 9.670704118 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42698429 V-1     T = -25 °C: 15.39344052 V-1
Break-through voltage: T = +20 °C: 402.2534075 V     T = -25 °C: 366.1072052 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:52 CET jreher Updated box and position via API.
11. Aug 2020 17:53:45 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:25 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:53 CET jreher Updated APD location via API.
27. Nov 2019 19:51:22 CET jreher Updated APD location via API.
25. Nov 2019 17:21:05 CET jreher Updated box and position via API.
03. Sep 2019 11:33:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:25 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:43 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:10 CEST Tobias Imported from Hamamatsu datasheet.