RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3109034446 - Archived data from Tue, 11. August 2020 17:53:44 CEST


This is all the information about APD 3109034446. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3109034446
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 22.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 4
EP1 batch: 142
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7412857 V     T = -25 °C: 345.4220274 V
Voltage for Gain 150: T = +20 °C: 388.6248822 V     T = -25 °C: 352.7999064 V
Voltage for Gain 200: T = +20 °C: 392.9938638 V     T = -25 °C: 356.9356168 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.66097345 V-1     T = -25 °C: 4.789707296 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.295659444 V-1     T = -25 °C: 9.675626804 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.48407037 V-1     T = -25 °C: 15.41187625 V-1
Break-through voltage: T = +20 °C: 408.1169362 V     T = -25 °C: 371.9128577 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:51 CET jreher Updated box and position via API.
11. Aug 2020 17:53:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:24 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:53 CET jreher Updated APD location via API.
27. Nov 2019 19:51:21 CET jreher Updated APD location via API.
25. Nov 2019 17:21:04 CET jreher Updated box and position via API.
03. Sep 2019 11:33:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:43 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:10 CEST Tobias Imported from Hamamatsu datasheet.