RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3109034445 - Archived data from Tue, 11. August 2020 17:53:44 CEST


This is all the information about APD 3109034445. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3109034445
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 17.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 128
Position in Box: 3
EP1 batch: 142
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5369048 V     T = -25 °C: 345.3707744 V
Voltage for Gain 150: T = +20 °C: 388.4170621 V     T = -25 °C: 352.7413693 V
Voltage for Gain 200: T = +20 °C: 392.7868752 V     T = -25 °C: 356.8774753 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.425585307 V-1     T = -25 °C: 4.820814266 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.581413521 V-1     T = -25 °C: 9.731920482 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.88522305 V-1     T = -25 °C: 15.47359295 V-1
Break-through voltage: T = +20 °C: 406.9028783 V     T = -25 °C: 371.2589286 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:22:24 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:27:18 CET jreher Updated box and position via API.
05. Feb 2021 11:04:51 CET jreher Updated box and position via API.
11. Aug 2020 17:53:44 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:24 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:19 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:53 CET jreher Updated APD location via API.
27. Nov 2019 19:51:21 CET jreher Updated APD location via API.
25. Nov 2019 17:21:04 CET jreher Updated box and position via API.
03. Sep 2019 11:33:11 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:24 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:42 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:10 CEST Tobias Imported from Hamamatsu datasheet.