RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3109034430 - Archived data from Fri, 05. February 2021 11:04:48 CET


This is all the information about APD 3109034430. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3109034430
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 17.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 40
EP1 batch: 141
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.5349979 V     T = -25 °C: 341.705322 V
Voltage for Gain 150: T = +20 °C: 384.306635 V     T = -25 °C: 348.9382639 V
Voltage for Gain 200: T = +20 °C: 388.6374243 V     T = -25 °C: 353.0102454 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.469791385 V-1     T = -25 °C: 5.134794169 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.755163205 V-1     T = -25 °C: 9.704798781 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.2487746 V-1     T = -25 °C: 15.39047652 V-1
Break-through voltage: T = +20 °C: 403.3957365 V     T = -25 °C: 367.4281475 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:17:22 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:56 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:48 CET jreher Updated box and position via API.
11. Aug 2020 17:53:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:23 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:52 CET jreher Updated APD location via API.
27. Nov 2019 19:51:13 CET jreher Updated APD location via API.
25. Nov 2019 17:21:02 CET jreher Updated box and position via API.
03. Sep 2019 11:32:45 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:42 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:59 CEST Tobias Imported from Hamamatsu datasheet.