RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3109034428 - Archived data from Tue, 11. August 2020 17:53:40 CEST


This is all the information about APD 3109034428. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3109034428
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 38
EP1 batch: 141
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.209639 V     T = -25 °C: 340.6272514 V
Voltage for Gain 150: T = +20 °C: 383.0042136 V     T = -25 °C: 347.8297248 V
Voltage for Gain 200: T = +20 °C: 387.3705001 V     T = -25 °C: 351.8743094 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.623276091 V-1     T = -25 °C: 4.833266418 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.040376985 V-1     T = -25 °C: 9.947343811 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.96878299 V-1     T = -25 °C: 15.92418764 V-1
Break-through voltage: T = +20 °C: 403.0074144 V     T = -25 °C: 366.9396823 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:47 CET jreher Updated box and position via API.
11. Aug 2020 17:53:40 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:23 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:51 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:52 CET jreher Updated APD location via API.
27. Nov 2019 19:51:13 CET jreher Updated APD location via API.
25. Nov 2019 17:21:02 CET jreher Updated box and position via API.
03. Sep 2019 11:32:45 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:19 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:42 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:59 CEST Tobias Imported from Hamamatsu datasheet.