RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3108034392 - Archived data from Tue, 11. August 2020 17:53:37 CEST


This is all the information about APD 3108034392. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3108034392
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.2 V
Dark current: 21.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 22
EP1 batch: 141
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.2555787 V     T = -25 °C: 339.9869347 V
Voltage for Gain 150: T = +20 °C: 382.068993 V     T = -25 °C: 347.178299 V
Voltage for Gain 200: T = +20 °C: 386.4580117 V     T = -25 °C: 351.2357941 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.559638499 V-1     T = -25 °C: 5.082526083 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.943020557 V-1     T = -25 °C: 9.543227057 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53550754 V-1     T = -25 °C: 15.15050709 V-1
Break-through voltage: T = +20 °C: 401.8039557 V     T = -25 °C: 366.0778169 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:46 CET jreher Updated box and position via API.
11. Aug 2020 17:53:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:21 CEST jreher Updated APD location via API.
09. Dec 2019 18:17:50 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:50 CET jreher Updated APD location via API.
27. Nov 2019 19:51:12 CET jreher Updated APD location via API.
25. Nov 2019 17:21:01 CET jreher Updated box and position via API.
03. Sep 2019 11:32:44 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:59 CEST Tobias Imported from Hamamatsu datasheet.