RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3108034391 - Archived data from Tue, 11. August 2020 17:53:37 CEST


This is all the information about APD 3108034391. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3108034391
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.4 V
Dark current: 18.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 21
EP1 batch: 141
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.4989633 V     T = -25 °C: 339.3712816 V
Voltage for Gain 150: T = +20 °C: 381.2728995 V     T = -25 °C: 346.579076 V
Voltage for Gain 200: T = +20 °C: 385.6316586 V     T = -25 °C: 350.6362409 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.522269002 V-1     T = -25 °C: 4.919152216 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.815479472 V-1     T = -25 °C: 9.185576658 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32570465 V-1     T = -25 °C: 16.36369744 V-1
Break-through voltage: T = +20 °C: 401.1196615 V     T = -25 °C: 365.613579 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:45 CET jreher Updated box and position via API.
11. Aug 2020 17:53:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:21 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:27 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:50 CET jreher Updated APD location via API.
27. Nov 2019 19:51:12 CET jreher Updated APD location via API.
25. Nov 2019 17:21:01 CET jreher Updated box and position via API.
03. Sep 2019 11:32:44 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:17 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:59 CEST Tobias Imported from Hamamatsu datasheet.