RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3107034361 - Archived data from Fri, 05. February 2021 11:04:44 CET


This is all the information about APD 3107034361. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3107034361
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 22.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 127
Position in Box: 3
EP1 batch: 140
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9153119 V     T = -25 °C: 347.9576779 V
Voltage for Gain 150: T = +20 °C: 390.7245841 V     T = -25 °C: 355.4314869 V
Voltage for Gain 200: T = +20 °C: 395.0684294 V     T = -25 °C: 359.657852 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.64439301 V-1     T = -25 °C: 4.132917518 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.192265456 V-1     T = -25 °C: 8.507879655 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36595741 V-1     T = -25 °C: 15.46166694 V-1
Break-through voltage: T = +20 °C: 410.4969274 V     T = -25 °C: 374.5365227 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:35:32 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:57 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:44 CET jreher Updated box and position via API.
11. Aug 2020 17:53:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:20 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:49 CET jreher Updated APD location via API.
27. Nov 2019 19:51:10 CET jreher Updated APD location via API.
25. Nov 2019 17:20:59 CET jreher Updated box and position via API.
03. Sep 2019 11:32:18 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:16 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.