RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3107034358 - Archived data from Tue, 11. August 2020 17:53:33 CEST


This is all the information about APD 3107034358. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3107034358
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 21.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 126
Position in Box: 50
EP1 batch: 140
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.875544 V     T = -25 °C: 341.9139979 V
Voltage for Gain 150: T = +20 °C: 384.6698008 V     T = -25 °C: 349.1374719 V
Voltage for Gain 200: T = +20 °C: 388.9998764 V     T = -25 °C: 353.2077393 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.688693673 V-1     T = -25 °C: 5.077508105 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.32765587 V-1     T = -25 °C: 9.498441984 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58460823 V-1     T = -25 °C: 15.02860715 V-1
Break-through voltage: T = +20 °C: 404.3358365 V     T = -25 °C: 368.0921228 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:59 CET oafedulidis Assigned to capsule by script
17. May 2021 09:15:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:41 CET jreher Updated box and position via API.
11. Aug 2020 17:53:33 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:20 CEST jreher Updated APD location via API.
09. Dec 2019 18:18:26 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:49 CET jreher Updated APD location via API.
27. Nov 2019 19:51:03 CET jreher Updated APD location via API.
25. Nov 2019 17:20:58 CET jreher Updated box and position via API.
03. Sep 2019 11:32:18 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:41 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.