RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3107034338 - Archived data from Tue, 11. August 2020 17:53:29 CEST


This is all the information about APD 3107034338. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3107034338
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 21.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 126
Position in Box: 33
EP1 batch: 140
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4498718 V     T = -25 °C: 343.4977859 V
Voltage for Gain 150: T = +20 °C: 386.2347683 V     T = -25 °C: 350.7539108 V
Voltage for Gain 200: T = +20 °C: 390.554942 V     T = -25 °C: 354.8300926 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.471479271 V-1     T = -25 °C: 4.811815801 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.768549903 V-1     T = -25 °C: 9.796379932 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.34413668 V-1     T = -25 °C: 15.5650531 V-1
Break-through voltage: T = +20 °C: 404.6152458 V     T = -25 °C: 368.7108757 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:39 CET jreher Updated box and position via API.
11. Aug 2020 17:53:29 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:18 CEST jreher Updated APD location via API.
09. Dec 2019 18:19:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:47 CET jreher Updated APD location via API.
27. Nov 2019 19:51:02 CET jreher Updated APD location via API.
25. Nov 2019 17:20:57 CET jreher Updated box and position via API.
03. Sep 2019 11:32:17 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:10 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:40 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:58 CEST Tobias Imported from Hamamatsu datasheet.