RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034284 - Archived data from Tue, 11. August 2020 17:53:22 CEST


This is all the information about APD 3106034284. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034284
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.5 V
Dark current: 21.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 46
EP1 batch: 138
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 372.9609098 V     T = -25 °C: 338.653194 V
Voltage for Gain 150: T = +20 °C: 380.7831415 V     T = -25 °C: 345.8345808 V
Voltage for Gain 200: T = +20 °C: 385.1693126 V     T = -25 °C: 349.8745109 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.631971336 V-1     T = -25 °C: 4.849899772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.118151659 V-1     T = -25 °C: 9.876765043 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04181525 V-1     T = -25 °C: 15.7417543 V-1
Break-through voltage: T = +20 °C: 401.1921641 V     T = -25 °C: 365.2378107 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:33 CET jreher Updated box and position via API.
11. Aug 2020 17:53:22 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:14 CEST jreher Updated APD location via API.
09. Dec 2019 18:19:36 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:45 CET jreher Updated APD location via API.
27. Nov 2019 19:50:52 CET jreher Updated APD location via API.
25. Nov 2019 17:20:53 CET jreher Updated box and position via API.
03. Sep 2019 11:31:32 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:39 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:57 CEST Tobias Imported from Hamamatsu datasheet.