RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034260 - Archived data from Tue, 11. August 2020 17:53:17 CEST


This is all the information about APD 3106034260. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034260
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 16.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 25
EP1 batch: 138
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9345727 V     T = -25 °C: 345.8073683 V
Voltage for Gain 150: T = +20 °C: 388.7843411 V     T = -25 °C: 353.1573276 V
Voltage for Gain 200: T = +20 °C: 393.1595133 V     T = -25 °C: 357.3135746 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.613252426 V-1     T = -25 °C: 5.019801788 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.076119986 V-1     T = -25 °C: 9.278076829 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.0668505 V-1     T = -25 °C: 14.47877316 V-1
Break-through voltage: T = +20 °C: 407.9173892 V     T = -25 °C: 371.9894566 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:49 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:51 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:04:31 CET jreher Updated box and position via API.
11. Aug 2020 17:53:17 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:13 CEST jreher Updated APD location via API.
09. Dec 2019 18:20:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:43 CET jreher Updated APD location via API.
27. Nov 2019 19:50:50 CET jreher Updated APD location via API.
25. Nov 2019 17:20:51 CET jreher Updated box and position via API.
03. Sep 2019 11:31:30 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:38 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:57 CEST Tobias Imported from Hamamatsu datasheet.