RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034253 - Archived data from Tue, 11. August 2020 17:53:16 CEST


This is all the information about APD 3106034253. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034253
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 373.2 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 18
EP1 batch: 137
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 373.2600695 V     T = -25 °C: 338.9150931 V
Voltage for Gain 150: T = +20 °C: 381.0021626 V     T = -25 °C: 346.0467604 V
Voltage for Gain 200: T = +20 °C: 385.3506106 V     T = -25 °C: 350.0599465 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612548744 V-1     T = -25 °C: 5.140535699 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.014394146 V-1     T = -25 °C: 9.738088773 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95504561 V-1     T = -25 °C: 15.57156018 V-1
Break-through voltage: T = +20 °C: 401.1903294 V     T = -25 °C: 365.2181492 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:30 CET jreher Updated box and position via API.
11. Aug 2020 17:53:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:12 CEST jreher Updated APD location via API.
09. Dec 2019 18:20:01 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:43 CET jreher Updated APD location via API.
27. Nov 2019 19:50:50 CET jreher Updated APD location via API.
25. Nov 2019 17:20:51 CET jreher Updated box and position via API.
03. Sep 2019 11:31:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:01 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:38 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:57 CEST Tobias Imported from Hamamatsu datasheet.