RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3106034246 - Archived data from Tue, 11. August 2020 17:53:15 CEST


This is all the information about APD 3106034246. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3106034246
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.7 V
Dark current: 20.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 125
Position in Box: 12
EP1 batch: 137
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.3733086 V     T = -25 °C: 340.8264876 V
Voltage for Gain 150: T = +20 °C: 383.1554217 V     T = -25 °C: 348.0271678 V
Voltage for Gain 200: T = +20 °C: 387.5119327 V     T = -25 °C: 352.0795358 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.52539474 V-1     T = -25 °C: 5.143990579 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.830248759 V-1     T = -25 °C: 9.659694147 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45849844 V-1     T = -25 °C: 15.37051643 V-1
Break-through voltage: T = +20 °C: 403.2903577 V     T = -25 °C: 367.3200331 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 12:55:08 CET oafedulidis Assigned to capsule by script
01. Dec 2021 12:56:25 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:04:29 CET jreher Updated box and position via API.
11. Aug 2020 17:53:15 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:11 CEST jreher Updated APD location via API.
09. Dec 2019 18:20:00 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:42 CET jreher Updated APD location via API.
27. Nov 2019 19:50:49 CET jreher Updated APD location via API.
25. Nov 2019 17:20:50 CET jreher Updated box and position via API.
03. Sep 2019 11:31:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:53:00 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:38 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:57 CEST Tobias Imported from Hamamatsu datasheet.