RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034215 - Archived data from Tue, 11. August 2020 17:50:10 CEST


This is all the information about APD 3105034215. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034215
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 20.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 124
Position in Box: 40
EP1 batch: 137
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:04:25 CET jreher Updated box and position via API.
11. Aug 2020 18:07:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:10 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:41 CET jreher Updated APD location via API.
27. Nov 2019 19:50:40 CET jreher Updated APD location via API.
25. Nov 2019 17:20:48 CET jreher Updated box and position via API.
03. Sep 2019 11:31:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:37 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.