RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034212 - Archived data from Tue, 11. August 2020 18:07:51 CEST


This is all the information about APD 3105034212. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034212
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 377.7 V
Dark current: 20.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 124
Position in Box: 37
EP1 batch: 136
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3259359 V     T = -25 °C: 343.6718284 V
Voltage for Gain 150: T = +20 °C: 386.1156725 V     T = -25 °C: 350.9526198 V
Voltage for Gain 200: T = +20 °C: 390.4476767 V     T = -25 °C: 355.0942778 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.667317715 V-1     T = -25 °C: 4.755616994 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.502698636 V-1     T = -25 °C: 9.695161588 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.46660343 V-1     T = -25 °C: 15.00356971 V-1
Break-through voltage: T = +20 °C: 406.7565735 V     T = -25 °C: 370.3989373 V
   
Notes:


Version history

Time Author Change comment
20. Oct 2021 09:32:23 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:50 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:24 CET jreher Updated box and position via API.
11. Aug 2020 18:07:51 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:09 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:40 CET jreher Updated APD location via API.
27. Nov 2019 19:50:40 CET jreher Updated APD location via API.
25. Nov 2019 17:20:47 CET jreher Updated box and position via API.
30. Aug 2019 11:32:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:37 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.