RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3105034208 - Archived data from Tue, 11. August 2020 18:07:50 CEST


This is all the information about APD 3105034208. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3105034208
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.3 V
Dark current: 20.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 124
Position in Box: 33
EP1 batch: 136
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.088504 V     T = -25 °C: 350.3840319 V
Voltage for Gain 150: T = +20 °C: 393.9609159 V     T = -25 °C: 357.9333794 V
Voltage for Gain 200: T = +20 °C: 398.3015815 V     T = -25 °C: 362.1303153 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.248206802 V-1     T = -25 °C: 4.316051891 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.03306498 V-1     T = -25 °C: 9.376901617 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04351573 V-1     T = -25 °C: 15.55196762 V-1
Break-through voltage: T = +20 °C: 413.9815107 V     T = -25 °C: 376.7122273 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 16:12:00 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:45 CEST jreher Updated box and position via API.
05. Feb 2021 11:04:24 CET jreher Updated box and position via API.
11. Aug 2020 18:07:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:09 CEST jreher Updated APD location via API.
06. Mar 2020 13:55:15 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:47:40 CET jreher Updated APD location via API.
27. Nov 2019 19:50:40 CET jreher Updated APD location via API.
25. Nov 2019 17:20:47 CET jreher Updated box and position via API.
30. Aug 2019 11:32:08 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:52:54 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:37 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:56 CEST Tobias Imported from Hamamatsu datasheet.